
By the end of the third week of work it is astonishingly clear that by Saturday evening, the stucco workers will finish with their work, much ahead of schedule. The Stupa emerges each day, wholer, crack free, repaired and more lovely than ever. On the last day there are 3 huge male deer with 14-point, 10-point and one with smaller antlers together on the road up to the Stupa. A single doe stands next to the Stupa. Each day the blessings from the Stupa brings miracles. Every worker came to love working at the Stupa and each did his & her very best. Gary gave KTTG a gift by repainting the smoker to match the Stupa. TC Pipeline of Monte Vista, CO did the careful sandblasting work. Kasa Builders, Taos, NM did the stucco work on this and the El Rito Stupa.







